Economical Soil Retention Systems
Morris-Shea can install beam and lagging walls as temporary or permanent soil retention systems for both shallow and deep excavations. These economical systems efficiently manage critical load requirements in difficult excavation applications.
Beam and lagging walls are typically constructed with vertically driven or drilled flanged beams that can be anchored to tieback systems for additional load management. Steel, wood or precast concrete panels are inserted between the spaced steel flanged beams for use as horizontal lagging.