Cutter Soil Mixing equipment employs an advanced soil mixing technique utilizing two rotating cutter heads to form a homogenous soil mix retaining wall. CSM can also create the final structural perimeter wall and a water cutoff structure. This can result in cost and schedule savings during excavation, dewatering, and perimeter wall construction.
Other Applications
CFA Foundation Installation for Raleigh, NC Office Tower
Morris-Shea used a Fundex F3500 drill rig to install more than 200 continuous flight auger (CFA) piles as a deep…
Automated Welder for Reinforcing Steel Cage
Morris-Shea utilizes state-of-the-artautomated welders to fabricate its own steel cages for use as reinforcement for deep foundation concrete piles.
Plant Expansion Shoring for Poured Concrete Foundation
Morris-Shea designed and installed a steel soldier pile and wood lagging system within the restricted environment at Granges’ Huntingdon, TN…