Cutter Soil Mixing equipment employs an advanced soil mixing technique utilizing two rotating cutter heads to form a homogenous soil mix retaining wall. CSM can also create the final structural perimeter wall and a water cutoff structure. This can result in cost and schedule savings during excavation, dewatering, and perimeter wall construction.
Other Applications
DeWaal Pile System Installation in Urban Environment
This DeWaal Pile System installation was in close proximity to an urban area with stringent noise and vibration restrictions. The…
Fundex CD20D Drill Rig in Restricted Access Environment
Morris-Shea Fundex CD20D drill rig installs cast-in-drilled-hole (CIDH) deep foundation piles in a restricted access jobsite. The powerful and compact…
Drilled Shaft Installation
Drilled shafts (caisson) are often installed from temporary work platform at marine jobsites. Morris-Shea pioneered the use of double-wall sectional…