The Morris-Shea team designed and installed this internally braced cofferdam, constructed of PZ-27 sheet piling, wide flange beam and a pipe bracing system, at the Pop-Darr gondola station on Disney World’s Hourglass Lake. The cofferdam installation provided a method to dewater the area so concrete work could be performed by the general contractor.
Other Applications
Deep Foundation Installation for Novelis Plant Expansion
Morris-Shea utilized Fundex F3500, Fundex F2800 and Fundex CD20D drill rigs to install DeWaal and CIDH piles at the Kentucky…
Morris-Shea Installation of Pipe Piles at Disney World
Morris-Shea installed 20” diameter pipe piles with 0.5” wall thickness to depths up to 160-feet as support for the Pop-Darr…
CSM Wall Installation
Cutter Soil Mixing (CSM) panels are formed by drilling overlapping primary and secondary panels to depths up to below grade…