Cutter Soil Mixing (CSM) panels are formed by drilling overlapping primary and secondary panels to depths up to below grade to serve as a soil retaining and water cutoff wall. Two soldier beams are precisely placed in each panel with survey control and templates to maintain proper placement and verticality. Bentonite slurry is used during drilling. It is replaced with cement slurry during extraction to provide a structurally sound, low permeability wall.
Other Applications
Cutter Soil Mixing Equipment
Cutter Soil Mixing equipment employs an advanced soil mixing technique utilizing two rotating cutter heads to form a homogenous soil…
Morris-Shea Fundex F3500 Drill Rig
This Fundex F3500 drill rig is positioning over a pile point prior to beginning installation of a continuous flight auger…
Drilled Shaft Installation
Drilled shafts (caisson) are often installed from temporary work platform at marine jobsites. Morris-Shea pioneered the use of double-wall sectional…