The Morris-Shea team designed and installed this internally braced cofferdam, constructed of PZ-27 sheet piling, wide flange beam and a pipe bracing system, at the Pop-Darr gondola station on Disney World’s Hourglass Lake. The cofferdam installation provided a method to dewater the area so concrete work could be performed by the general contractor.