Morris-Shea designed and installed a steel soldier pile and wood lagging system within the restricted environment at Granges’ Huntingdon, TN aluminum rolling plant. The shoring allows the construction of three poured concrete foundation pits in the existing building. The plant expansion accommodates the installation of a new casting furnace.
Other Applications
Cutter Soil Mixing Equipment
Cutter Soil Mixing equipment employs an advanced soil mixing technique utilizing two rotating cutter heads to form a homogenous soil…
CSM Wall Installation
Cutter Soil Mixing (CSM) panels are formed by drilling overlapping primary and secondary panels to depths up to below grade…
Morris-Shea Fundex F3500 Drill Rig
Morris-Shea Fundex F3500 drill rig is setting up to install a Continuous Flight Auger (CFA) deep foundation pile at a…