This Fundex F3500 drill rig is positioning over a pile point prior to beginning installation of a continuous flight auger (CFA) pile.
Other Applications
Morris-Shea Onboard Monitoring System
All aspects of the drilling process and concrete placement are observed and recorded by the Morris-Shea Automated Monitoring Equipment. Upon…
Beam and Lagging Walls
These Morris-Shea beam and lagging walls were installed as a temporary earth retention system. The system was constructed with vertically…
Marine Foundation Structure
The installation of marine structures at ports and waterways often requires unique construction techniques such as the marine foundation system…