Morris-Shea designed and installed a steel soldier pile and wood lagging system within the restricted environment at Granges’ Huntingdon, TN aluminum rolling plant. The shoring allows the construction of three poured concrete foundation pits in the existing building. The plant expansion accommodates the installation of a new casting furnace.