These Morris-Shea beam and lagging walls were installed as a temporary earth retention system. The system was constructed with vertically driven flanged beams that were anchored to a tieback system for additional load management. Wood panels were attached to the spaced steel flanged beams for use as horizontal lagging
Other Applications
Fundex CD20D Drill Rig in Restricted Access Environment
Morris-Shea Fundex CD20D drill rig installs cast-in-drilled-hole (CIDH) deep foundation piles in a restricted access jobsite. The powerful and compact…
Drilled Shaft Installation
Drilled shafts (caisson) are often installed from temporary work platform at marine jobsites. Morris-Shea pioneered the use of double-wall sectional…
Cutter Soil Mixing Equipment
Cutter Soil Mixing equipment employs an advanced soil mixing technique utilizing two rotating cutter heads to form a homogenous soil…