These Morris-Shea beam and lagging walls were installed as a temporary earth retention system. The system was constructed with vertically driven flanged beams that were anchored to a tieback system for additional load management. Wood panels were attached to the spaced steel flanged beams for use as horizontal lagging
Other Applications
Cone Penetration Testing Rig Interior
This interior view of the 30-ton Morris-Shea Cone Penetration Testing rig (CPT) presents the results of a recent test on…
CSM Wall Installation
Cutter Soil Mixing (CSM) panels are formed by drilling overlapping primary and secondary panels to depths up to below grade…
Morris-Shea Installation of Pipe Piles at Disney World
Morris-Shea installed 20” diameter pipe piles with 0.5” wall thickness to depths up to 160-feet as support for the Pop-Darr…