The Morris-Shea team designed and installed this internally braced cofferdam, constructed of PZ-27 sheet piling, wide flange beam and a pipe bracing system, at the Pop-Darr gondola station on Disney World’s Hourglass Lake. The cofferdam installation provided a method to dewater the area so concrete work could be performed by the general contractor.
Other Applications
Morris-Shea Onboard Monitoring System
All aspects of the drilling process and concrete placement are observed and recorded by the Morris-Shea Automated Monitoring Equipment. Upon…
Loading Casing into Fundex CD20D in Spruce Goose Hanger
Loading 14-inch casings into Morris-Shea Fundex CD20D drill rig for installation as a permanent CIDH pile foundation in the new…
Morris-Shea Fundex F3500 Drill Rig
This Fundex F3500 drill rig is positioning over a pile point prior to beginning installation of a continuous flight auger…