This Fundex F3500 drill rig is positioning over a pile point prior to beginning installation of a continuous flight auger (CFA) pile.
Other Applications
Continuous Flight Augercast CFA Pile
Continuous Flight Auger pile installed with Morris-Shea Fundex F3500 drill rig. Our fleet of powerful drill rigs can install CFA…
Morris-Shea 30-Ton Cone Penetration Test (CPT) rig
The Morris-Shea cone penetration test CPT rig incorporates new test results with archival information to provide an accurate estimation of…
Drilled Shaft Deep Foundation Jobsite
This permanent drilled shaft deep foundation (caisson) offered high load bearing capacity and was ideal for use in the jobsite’s…