These Morris-Shea beam and lagging walls were installed as a temporary earth retention system. The system was constructed with vertically driven flanged beams that were anchored to a tieback system for additional load management. Wood panels were attached to the spaced steel flanged beams for use as horizontal lagging
Other Applications
DeWaal Pile System Installation in Urban Environment
This DeWaal Pile System installation was in close proximity to an urban area with stringent noise and vibration restrictions. The…
Morris-Shea Fundex F3500 Drill Rig
Morris-Shea Fundex F3500 drill rig is setting up to install a Continuous Flight Auger (CFA) deep foundation pile at a…
CSM Wall Soil Retention
Cutter Soil Mixing, CSM, is an advanced soil mixing technique that offers soil retention and water cutoff wall construction. A…