Morris-Shea designed and installed a steel soldier pile and wood lagging system within the restricted environment at Granges’ Huntingdon, TN aluminum rolling plant. The shoring allows the construction of three poured concrete foundation pits in the existing building. The plant expansion accommodates the installation of a new casting furnace.
Other Applications
Morris-Shea Fundex CD20 Drill Rig in YouTube Soundstage
The compact Morris-Shea Fundex CD20 drill rig maneuvered inside the new YouTube Soundstage at the old Hughes Spruce Goose Aircraft…
Morris-Shea Fundex F3500 Drill Rig
This Fundex F3500 drill rig is positioning over a pile point prior to beginning installation of a continuous flight auger…
Disney World Cofferdam installation
The Morris-Shea team designed and installed this internally braced cofferdam, constructed of PZ-27 sheet piling, wide flange beam and a…