Morris-Shea Installs Temporary Access Bridges
Our team maintains the expertise and equipment required for the design and construction of a heavy capacity temporary access bridge. Morris-Shea work bridges and construction platforms can safely support weights up to that of a 250 ton crane.
The installation of temporary bridge can require the construction of cofferdams or other water retention systems prior to driving or drilling the structure’s foundation. Morris-Shea can design cost-saving construction efficiencies into these temporary projects that minimize project scheduling and material costs.
![temporary work platform](http://sheabrothersmexico.mx/wp-content/uploads/2018/12/San-Juan-PR-Bridge-Photos3-e1549915459726.jpg)